top of page
Search

Energy Savings and Progress Update on the 1.5MW Installation at Leicester's Recycling Plant

  • grahamwray
  • Oct 31
  • 2 min read

This Leicester Recycling Plant is making a notable impact with its ambitious project to install a 1.5MW energy system. This initiative is more than just a technology upgrade; it is a crucial step towards improved sustainability and energy efficiency. In this post, we will highlight the progress made, the energy savings expected, and the wider implications for the recycling industry.

Understanding the 1.5MW Installation


The 1.5MW installation at the Leicester Recycling Plant focuses on utilizing renewable energy, through solar power. It aims to lower the plant's dependence on fossil fuels, resulting in considerable cost savings and reduced carbon emissions.


The project kicked started in september, with a dedicated team of engineers and technicians ensuring every detail was carefully executed. This effort involves not only installing over 2500 solar panels but also integrating sophisticated energy management systems. These systems help monitor and optimize energy usage throughout the facility, ensuring every watt of renewable energy is used efficiently.


The Importance of Energy Efficiency in Recycling


Energy efficiency plays a vital role in the recycling sector, where operational expenses can quickly add up. Reducing energy consumption enables facilities to cut costs, allowing them to direct funds toward greener practices and advanced technologies. The Leicester Recycling Plant serves as a compelling example of how energy efficiency facilitates economic and environmental advantages.


The recycling process itself is known to be energy-heavy. According to a 2019 study, recycling one ton of aluminum saves up to 95% of the energy required to produce new aluminum from ore. By embracing a renewable energy model, the Leicester facility actively works to lessen its environmental footprint. This not only supports global sustainability targets but also establishes a benchmark for other recycling facilities.


Progress Update: Milestones Achieved


The installation project has reached a crucial milestones. The solar panels are getting mounted!





Energy Savings: What to Expect


The projected energy savings from the 1.5MW installation are substantial. Once fully operational, the plant will significantly reducing energy expenses. This decrease in energy costs will significantly boost the plant's financial health and enable reinvestment into further sustainable efforts.


Moreover, transitioning to renewable energy sources is expected to diminish greenhouse gas emissions annually. This reduction aligns with the growing need to cut carbon footprints across industries and promotes a greener future.


Community Impact and Engagement


The Leicester Recycling Plant's renewable energy initiative resonates beyond its own operations. It serves as a model for local businesses, inspiring them to explore similar sustainability upgrades.





 
 
 

Comments

Rated 0 out of 5 stars.
No ratings yet

Add a rating
GMEC Electrical Logo

GMEC Electrical, 58 Cross street, Northam, Devon EX391BX
Tel: 01271 342299 | Email: info@gmecelectrical.co.uk

M: 07990 970268 (Graham)  |  07990 970264 (Marcus)

bottom of page